News

Back to top

DIFK staff developed a “7-Day Action Plan for Depositor Compensation” during a joint workshop

News

DIFK staff organized a joint workshop for purposes of drafting a 7-Day Action Plan for Depositor Compensation. The Action Plan is developed in accordance with the Regulation on Depositor Compensation, Operational and Technical Framework and based on the Document on the detailed design of the Depositor Compensation System (DCS). The drafting of the action plan complies with the recommendation from Core Principle 15: “Reimbursing Depositors”, stemming from the compatibility assessment of the deposit insurance system in Kosovo versus the IADI Core Principles.

The workshop was held in Sandanski, Bulgaria on August 15-19, 2016.

photo1